Local
Alaska Highway bridge work north of Pink Mountain keeps traffic to one lane until Nov. 30
Oversize loads face limits at the Beatton River crossing, and Pine Pass paving runs to Nov. 20.
By The NEBC Current newsroom
PINK MOUNTAIN, B.C. - Anyone running the Alaska Highway between Fort St. John and Fort Nelson should plan on a single lane at the Beatton River bridge for the rest of November.
DriveBC lists bridge construction at the crossing, just north of the Pink Mountain Road turnoff, with alternating one-lane traffic until 11:59 p.m. on Monday, Nov. 30. The job has been under way since Sept. 22.
Big rigs need to check their dimensions before they get there. DriveBC posts a width limit of 3.8 metres, a length limit of 27.5 metres, a height limit of 5.33 metres and a weight limit of 81,500 kilograms through the work zone. That matters on a route that carries a steady stream of oversize industrial loads to and from the Northern Rockies.
The other end of the Highway 97 corridor has its own slowdown. West of Chetwynd, paving crews are still working in the Pine Pass between Mt. Solitude and Powder King Road. DriveBC shows alternating single-lane traffic there from 7 a.m. to 7 p.m., Monday through Saturday, until Friday, Nov. 20. That work has been going since mid-August.
Current conditions and any changes to either job are posted at DriveBC.ca.
Sources: DriveBC, event RIDE-102655, Beatton River bridge construction (updated Oct. 29, 2026), and event RIDE-101226, Mt. Solitude to Powder King Road paving (updated Nov. 9, 2026), via the B.C. Open511 feed. BC Highway News Highway 97 report (bchighway.com), which mirrors DriveBC..
You may like
December is one of the most dangerous months on B.C. roads, and safety groups are urging drivers to slow down and plan ahead
Company behind a 30-turbine wind farm south of Fort St. John asks the regional district to rezone farmland, and directors push back
Former premier David Eby skips the NDP swearing-in as his shrunken caucus takes its seats in Opposition
Twelve more First Nations buy into Coastal GasLink, the pipeline that starts near Dawson Creek
School District 60 cancels buses as freezing rain glazes Peace roads, but schools stay open