Local
Tumbler Ridge residents have until Dec. 3 to weigh two designs for the new secondary school
School District 59 is asking the public to compare a prefabricated option with a traditional site-built school, after consultation sessions that began the week of Nov. 16.
By The NEBC Current newsroom

TUMBLER RIDGE, B.C. — People in Tumbler Ridge have until Dec. 3 to fill out a public survey on plans for a new secondary school, as School District 59 compares two ways of building it: a prefabricated or modular school, and a traditional building constructed on site.
The district posted its consultation notice on Nov. 5, saying sessions with students, families, staff and other stakeholders would start the week of Nov. 16. It said Urban Systems was hired to help, and would work with Safer Schools Together so the conversations stay safe and trauma-informed.
Board chair Chad Anderson told CBC News the two design concepts were being taken to the community this week. He said he would have had trouble telling one construction method from the other just by looking, and that both need to feel safe and welcoming for students and staff coming back to a permanent school.
A Nov. 23 report by CJDC-TV said the survey opened Nov. 20 and is also meant to gather views on learning spaces, accessibility, wellbeing, safety and how the wider community might use the building. The district said it will put that feedback together with what it hears from students, families, staff, first responders, local businesses and the District of Tumbler Ridge.
SD59 has already said some pieces are settled. The new school will have a gymnasium sized for the school and the town, and a trades workshop with the same or better function than students had before. Conceptual drawings were to be shared during the November sessions so people can compare the two build paths.
A Sept. 21 community update from the district said the Ministry of Infrastructure and the District of Tumbler Ridge had pointed to a potential site in the middle bench area, in line with what many people asked for in the spring Safer Schools Together consultation. An RFP for early site work was to go out that week so officials could test whether the ground will work, before winter made the job harder.
The building this project will replace was demolished over the summer. Classes are being held, for now, in a modular campus set up as a stand-in. A Sept. 3 letter from Superintendent Christy Fennell said a prefabricated gym was going up behind the aquatic centre and skating rink for the school to use in the meantime, and that the gym is later meant for municipal use.
Anderson told CBC the new school is being designed for about 225 students, and that construction could begin as early as next summer, depending on which method is chosen. The survey is open through Dec. 3.
Sources: School District 59 Peace River South, "New Secondary School Consultation" (Nov. 5, 2026) and "New Tumbler Ridge School Project Takes Next Step" (Sept. 21, 2026). CBC News, "Draft designs unveiled for new Tumbler Ridge secondary school" (Nov. 20, 2026). CJDC-TV, "Public survey for residents launched as planning continues for new secondary school in Tumbler Ridge" (Nov. 23, 2026)..
You may like
December is one of the most dangerous months on B.C. roads, and safety groups are urging drivers to slow down and plan ahead
Company behind a 30-turbine wind farm south of Fort St. John asks the regional district to rezone farmland, and directors push back
Twelve more First Nations buy into Coastal GasLink, the pipeline that starts near Dawson Creek
School District 60 cancels buses as freezing rain glazes Peace roads, but schools stay open